Aluminum Suspending Ceiling
Product Type:
Kinds of Ceiling:
-
B-shaped Strip Ceiling
-
C-shaped Strip Ceiling
-
E-shaped Hook-on Ceiling
-
G-shaped Strip Ceiling
-
H-shaped Strip Ceiling
-
K-shaped Expansive Ceiling
-
O-shaped Tube-shaped and
Adequately Ceiling -
U-shaped Long-shaped and
Adequately Ceiling -
Inner-ridged Square Ceiling
-
In-line Type Handing Ceiling
-
Wind-proof Type Handing Ceiling
-
Grid Ceiling
-
Single Panel of Aluminum
-
Ridged Square Ceiling
Product Type:
-
Beijing West Railway Station
-
Beijing South Railway Station
-
Shijingshan Court
-
Beijing West Railway Station
-
-
Shijingshan Court
Installation Memorandum:
Please pay attention to the item as following toward your products be able to keep the perfect, original result.
1.How to lay stack at the project site?
- Lay the product on the dry place of the inside room.
- To carry or lay lightly, don't hit it.
- According to the direction of packing arrow and the layers, to lay in order.
- Don't trample on product.
2.How to install at the project site?
- To know the installation map of product and operating technology at site.
- Put on a work pair of gloves, try to avoid being left over fingerprint on the product surface.
- please clean the products with clean water in time,that if you dirty product incautiously.
- Please open and take of products according to the direction of packing box.
- To choose the suitable tools of installation and cutting.
Steps of Installation of Metal Ceiling:
1.Workers need measuring the real length and width in ceiling space.
2.Counting ceiling quantity according to the real length and width.
3.Setting the height of ceiling and the horizontal line of installation refering to the ground level or top level.
- Common method:Measure by level.
- Simple means:With well transparent pipe which is full of water in the middle, then, link the both end of transparent pipe, that is the horizontal line.
- Measure out the height of ceiling from top to bottom perpendicularly.
4.Fixing the angle of edge, to the panel, wall or curtain box along the horizon by expansion tube or wood screw.
5.Make sure that the hanger rod location and quantity according to the demand of technology, then fit the metal bolt to the top of room by percussion drilling.
6.Link the main carrier fitting to the hanger rod, then fix the carrier of ceiling to the main carrier.
7.Adjust main height of carrier, make the main carrier, vice-carrier and angle of edge into a horizontal line, that's height is the height of ceiling.
8.Adjust the height with water level:
- All of carriers are on the horizon.
- All of carriers are arranged in modulus of ceiling panel order in parallel.
- Each carrier be at the same level.
9.Load ceiling with carrier in the order, when you had completed two of uninstalled ceiling, first you fix one of the ceiling to the position of a wall, then press the ceiling with a spring, lamination, finish, install the last ceiling.
10.Cleaning surface of ceiling.
11.Others
- The inner pipe and line should be installed and checked for leakage before installing ceiling.
- Before installation, all around wall must finish.
- The light, exhaust fan, broadcast, spray pipe and smoke detector, that must tap at site, at the same time.
- The worker need putting on one's gloves before installation.